Close Menu
  • Home
  • AI
  • Entertainment
  • Finance
  • Sports
  • Tech
  • USA
  • World
  • Latest News

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

What's Hot

Storm apologizes after co-owner reprimands teenage girls for supporting Cunningham | News Basketball News

July 30, 2026

China threatens to retaliate against US ban on humanoid robots, claims it will cause ‘serious damage’ to relations

July 30, 2026

Mark Zuckerberg predicts billions of people will have personal AI agents within five years

July 30, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram Vimeo
BWE News – USA, World, Tech, AI, Finance, Sports & Entertainment Updates
  • Home
  • AI
  • Entertainment
  • Finance
  • Sports
  • Tech
  • USA
  • World
  • Latest News
BWE News – USA, World, Tech, AI, Finance, Sports & Entertainment Updates
Home » Nvidia’s Kyber rack system delayed to 2028 due to manufacturing failure
Tech

Nvidia’s Kyber rack system delayed to 2028 due to manufacturing failure

adminBy adminJuly 6, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
Share
Facebook Twitter LinkedIn Pinterest Email


Nvidia Corp. Chief Executive Officer Jensen Huang speaks alongside the Vera Rubin Ultra Kyber Compute Tray and Vera Rubin Ultra Kyber NVLink MidPlane during the keynote address at the Nvidia GTC conference on Monday, March 16, 2026 in San Jose, California, USA.

Bloomberg | Bloomberg | Getty Images

NVIDIA’s next big product, the Kyber rack-scale architecture designed to include the 2027 Rubin Ultra chip, will be delayed by more than 12 months until 2028, according to research firm Semianalysis. This is the latest in a series of setbacks that cast doubt on the AI ​​giant’s product roadmap.

Kyber is a server cabinet that packs 144 of Nvidia’s most powerful chips into a single unit that work together as one giant computer to provide AI companies with the horsepower they need to train and run cutting-edge models.

This design installs graphics processing units in compute trays that are arranged vertically instead of horizontally to increase density and reduce latency. It was also scheduled to debut in 2027 with Nvidia’s next-generation rack-scale system, the Vera Rubin Ultra.

Semianalysis said in a post Monday that the setback was due to difficulties manufacturing a critical circuit board at the heart of the system.

“The Kyber NVL144 rack architecture has been postponed to 2028 as the PCB midplane continues to be challenging from a manufacturability standpoint,” the company said, referring to the specialized multilayer printed circuit boards that connect the electronic modules in the system.

NVL576, a large system linking eight racks via optical connections, is also likely to be delayed or limited to small quantities, the research firm said.

Nvidia did not respond to CNBC’s request for comment.

The reported delays are adding to the strain on Nvidia’s entire product line and highlight concerns that Nvidia’s breakneck annual release pace is hitting manufacturing limits.

A backup plan to bolt two of Nvidia’s current-generation racks together to provide similar power was also scrapped after cloud customers rejected the design as difficult to use and expensive to operate. “It was subsequently discontinued following intense backlash from CSPs (cloud service providers) and hyperscalers due to its strange design and heavy operational burden,” Semi-Analysis said.

As such, NVIDIA “doesn’t have a proven solution to scale up Rubin Ultra’s global size,” the semi-analysis said, predicting it could impact rivals. advanced micro device and googleThe company’s in-house chips are already winning business from top AI labs, making them a rare technological advance in the high-end market.

Nvidia’s current generation Rubin systems are in full production and will begin shipping this fall to eight cloud partners, including Amazon Web Services, Microsoft Azure, and Google Cloud. The semi-analysis also predicts that Nvidia’s data center computing revenue will exceed Wall Street consensus by 20% in the second half of fiscal 2027.

Nvidia’s stock price fluctuated in pre-market trading, ending down less than 0.1% at $194.79.

Never miss the most trusted news moments in business news when you choose CNBC as your preferred source on Google.



Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
Previous ArticleSuper Typhoon Babi hits US Pacific Island territories with major military bases
Next Article Acting DNI Pulte fires dozens of intelligence officials: MS Now
admin
  • Website

Related Posts

US wants to use AI in Asia, but China has monopoly on cheap models

July 30, 2026

SpaceX Memphis AI data center faces demands from House Energy Committee

July 30, 2026

Gen Z protests raise Instagram profile in India

July 30, 2026

What to sell and what to keep

July 30, 2026
Leave A Reply Cancel Reply

Our Picks

Newly freed hostages face long road to recovery after two years in captivity

October 15, 2025

Former Kenyan Prime Minister Raila Odinga dies at 80

October 15, 2025

New NATO member offers to buy more US weapons to Ukraine as Western aid dwindles

October 15, 2025

Russia expands drone targeting on Ukraine’s rail network

October 15, 2025
Don't Miss
Entertainment

Dakota Johnson, Ana de Armas, etc.

By adminJuly 30, 20260

Marilyn Monroe was the first to play Marilyn Monroe. “Do you want to see me…

The Game of Thrones and Doctor Who actor was 80 years old

July 30, 2026

Sean “Diddy” Combs’ prison release date moved to January 2028

July 30, 2026

Emma Stone and Ryan Gosling’s “Crazy, Stupid, Love” casting and audition details

July 30, 2026
About Us
About Us

Welcome to BWE News – your trusted source for timely, reliable, and insightful news from around the globe.

At BWE News, we believe in keeping our readers informed with facts that matter. Our mission is to deliver clear, unbiased, and up-to-date news so you can stay ahead in an ever-changing world.

Our Picks

French student fined for licking straw in Singapore

July 30, 2026

Live updates: US resumes attack on Iran as war expands to involve more countries

July 30, 2026

Russia launches large-scale attack on Ukraine, unidentified projectile explodes in Poland

July 30, 2026

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Facebook X (Twitter) Instagram Pinterest
  • Home
  • About Us
  • Advertise With Us
  • Contact US
  • DMCA
  • Privacy Policy
  • Terms & Conditions
© 2026 bwenews. Designed by bwenews.

Type above and press Enter to search. Press Esc to cancel.