Close Menu
  • Home
  • AI
  • Entertainment
  • Finance
  • Sports
  • Tech
  • USA
  • World
  • Latest News

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

What's Hot

Iranian soccer player hands over passport to US embassy for World Cup visa approval | 2026 World Cup News

June 5, 2026

Nikkei 225, Kospi, Hang Seng Index, CSI300, Nifty50

June 5, 2026

The ‘together tech’ wave may be the most interesting bet for startups in 2026

June 5, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram Vimeo
BWE News – USA, World, Tech, AI, Finance, Sports & Entertainment Updates
  • Home
  • AI
  • Entertainment
  • Finance
  • Sports
  • Tech
  • USA
  • World
  • Latest News
BWE News – USA, World, Tech, AI, Finance, Sports & Entertainment Updates
Home » Data center energy demand predicted to jump nearly 300% by 2035
AI

Data center energy demand predicted to jump nearly 300% by 2035

adminBy adminDecember 2, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
Share
Facebook Twitter LinkedIn Pinterest Email


Planned data center construction shows no signs of slowing down, with new additions requiring 2.7 times (almost three times) the sector’s current electricity demand over the next 10 years, according to a new report from BloombergNEF.

By 2035, data centers will consume 106 gigawatts of power, a significant increase from the 40 gigawatts used today. BloombergNEF said much of that growth will occur in more rural areas as facilities expand in size and land near urban areas becomes scarce.

Part of the growth driver is the huge scale of the planned data centers. Today, only 10% of data centers consume more than 50 megawatts of power, but over the next 10 years, the average power for new facilities will be well over 100 megawatts. The largest sites help skew the data. Almost a quarter exceed 500 megawatts, and some exceed 1 gigawatt.

Graph showing data center power usage through 2032.
Planned data centers will be significantly larger than currently operating data centersImage credit: BloombergNEF

At the same time, utilization across all data centers is expected to increase from 59% to 69% as AI training and inference increases to nearly 40% of total datacenter compute.

In some ways, the new report’s findings are not surprising. AI companies are racing to build more powerful data centers, with global investment in facilities reaching up to $580 billion this year. This is more than the world spends to find new sources of oil.

Still, a new report shows how quickly the situation is changing. This is a significant upward revision from a document published by the group in April. This rise was driven by a surge in new projects announced since then. “The average timeline for a project to come online is seven years, so early-stage development has the greatest impact on the final stage of our forecasts,” the new report says.

Early-stage projects more than doubled from early 2024 to early 2025, but these are different from projects that are committed or currently under construction.

tech crunch event

san francisco
|
October 13-15, 2026

Much of that new capacity is planned for Virginia, Pennsylvania, Ohio, Illinois and New Jersey. They are located in areas known to industry experts for PJM Interconnection, the regional transmission organization tasked with operating the power grids in those states and others, including Delaware, West Virginia, and parts of Kentucky and North Carolina. There will also be a number of additions to the Arcot Texas grid.

The report arrives as the PJM interconnect comes under the radar of its independent monitor, Monitoring Analytics. The group filed a complaint with the Federal Energy Regulatory Commission (FERC), arguing that PJM has the authority to approve new data center connections only if there is sufficient capacity on the grid.

“As part of its obligation to maintain reliability, PJM has the authority to require that new large data center loads be waited on the system until it can reliably handle the load,” Monitoring Analytics wrote. “PJM has permission to create load queues.”

Additionally, data centers are responsible for today’s high electricity prices in the region, the group said.

“It is unjust and unreasonable for PJM to fail to clarify and enforce existing rules and protect reliable and affordable service at PJM,” the group said.

Catch the latest announcements on everything from agent AI to cloud infrastructure to security and more from Amazon Web Services’ flagship event in Las Vegas. This stream is provided in partnership with AWS.



Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
Previous ArticleStocks soar on sales growth and strong guidance
Next Article Jamie Campbell Bower talks about Vecna’s transformation in Stranger Things
admin
  • Website

Related Posts

The ‘together tech’ wave may be the most interesting bet for startups in 2026

June 5, 2026

Token bill deadline looms: Industry battle to control runaway costs of AI

June 5, 2026

AirTrunk commits $30 billion to build 5GW AI data center in India

June 5, 2026

Mira Murati cautiously returns to the spotlight

June 5, 2026
Leave A Reply Cancel Reply

Our Picks

Newly freed hostages face long road to recovery after two years in captivity

October 15, 2025

Former Kenyan Prime Minister Raila Odinga dies at 80

October 15, 2025

New NATO member offers to buy more US weapons to Ukraine as Western aid dwindles

October 15, 2025

Russia expands drone targeting on Ukraine’s rail network

October 15, 2025
Don't Miss
Entertainment

What happened to James Handy? Michael Gledhill arrested in connection with stabbing

By adminJune 5, 20260

‘Top Gun: Maverick’ actor James Handy allegedly stabbed to death by his girlfriend’s sonTragedy has…

How Taylor Lautner supported his wife Tay Lantner during her pregnancy

June 5, 2026

‘The Santa Clause’ star David Krumholtz reveals ‘minimum’ residual pay for film

June 5, 2026

Scary movie secrets revealed

June 5, 2026
About Us
About Us

Welcome to BWE News – your trusted source for timely, reliable, and insightful news from around the globe.

At BWE News, we believe in keeping our readers informed with facts that matter. Our mission is to deliver clear, unbiased, and up-to-date news so you can stay ahead in an ever-changing world.

Our Picks

Exclusive: Adviser to Iran’s supreme leader warns of potential war as talks over $24 billion stall

June 5, 2026

Andrew Mountbatten-Windsor was subletting a cottage on the grounds of Royal Lodge while paying peppercorn rent, reports say.

June 5, 2026

Crown Princess of Norway on waiting list for lung transplant

June 5, 2026

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Facebook X (Twitter) Instagram Pinterest
  • Home
  • About Us
  • Advertise With Us
  • Contact US
  • DMCA
  • Privacy Policy
  • Terms & Conditions
© 2026 bwenews. Designed by bwenews.

Type above and press Enter to search. Press Esc to cancel.