Close Menu
  • Home
  • AI
  • Entertainment
  • Finance
  • Sports
  • Tech
  • USA
  • World
  • Latest News

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

What's Hot

Trisha Paytas Learns About GLP-1, Loses 26 Pounds in 6 Weeks

June 18, 2026

Lionel Messi’s father undergoing treatment for health problems, family says | 2026 World Cup News

June 18, 2026

Trump administration temporarily expands automatic payment discounts for student loans

June 18, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram Vimeo
BWE News – USA, World, Tech, AI, Finance, Sports & Entertainment Updates
  • Home
  • AI
  • Entertainment
  • Finance
  • Sports
  • Tech
  • USA
  • World
  • Latest News
BWE News – USA, World, Tech, AI, Finance, Sports & Entertainment Updates
Home » Government-mandated fast lanes to grid just installed at AI data center
AI

Government-mandated fast lanes to grid just installed at AI data center

adminBy adminJune 18, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
Share
Facebook Twitter LinkedIn Pinterest Email


The Federal Energy Regulatory Commission (FERC) on Thursday directed power grid operators to quickly respond to interconnection requests from data centers and other large electricity users.

Under the order, six major power grid operators will have to prove that their data centers “can be connected to the power grid in a timely and orderly manner.” Data centers are responsible for paying interconnect costs. Commissioners unanimously approved the order.

FERC also provided an avenue for grid technology startups and directed grid operators to consider “alternative transmission technologies.” Although the commission did not mention specific technologies, the directive could include solid-state transformers and superconducting transmission lines.

Grid operators are currently required to submit a report within 30 days detailing any available generation capacity. Additionally, you have 60 days to “defend or revise” electricity rates in your area. FERC also directed grid operators to further address behind-the-meter power in data centers.

FERC’s directive gave data centers fast lanes for connectivity but did not address the lack of power generation capacity.

New power plants also have connection problems, which has delayed their ability to connect to the grid. By the end of 2023, grid connection requests for power plants exceeded the total capacity of the existing power plant fleet. This meant that the lines to connect to the power grid were longer than the grid itself could theoretically accommodate.

Against this backdrop, electricity demand from data centers is expected to nearly triple by 2035. Grid operators, accustomed to near-zero demand growth for the past two decades, can no longer sustain the load. Some countries, such as PJM, the country’s largest power transmission operator, are in a state of turmoil, with major power companies on the verge of withdrawal.

Technology companies and developers are turning to on-site or behind-the-meter power (which is typically more expensive and complex) in desperation because many locations cannot connect to the grid in a timely manner.

Still, enough projects have resulted in higher electricity prices in many areas. According to Bloomberg, wholesale power prices are up 267% compared to five years ago.

FERC was urged to address the issue by Energy Secretary Chris Wright, who said in October that delays in connecting data centers to the grid could hurt America’s competitiveness in AI. Since then, public sentiment towards AI and data centers has deteriorated significantly.

Meanwhile, the Trump administration announced Wednesday that it will pay wind power developer Invenergy $765 million to cancel offshore wind leases near California, Maine and New York. The company said it would use the money to build natural gas plants in the Midwest and geothermal projects in the West. One of Invenergy’s wind projects is expected to generate up to 2.4 gigawatts of electricity, enough to power approximately 1.8 million homes at peak output.

The Trump administration is currently spending a total of about $2.6 billion to halt offshore wind development.

If you buy through links in our articles, we may earn a small commission. This does not affect editorial independence.



Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
Previous ArticleAmazon investigates engineer who criticized AI data center expansion
Next Article Oil stabilizes after Vance announces more than 12 million barrels of Hormuz exit
admin
  • Website

Related Posts

‘Queer Eye’ life coach Karamo Brown launches ‘Kē’, a wellness app powered by an AI digital clone of himself

June 18, 2026

The smartphone era has created an attention crisis. Slowtech is the solution

June 18, 2026

Amazon wants to challenge Nvidia more directly by selling AI chips

June 18, 2026

Nearly half of U.S. singles feel negatively about AI in dating, Match says

June 18, 2026
Leave A Reply Cancel Reply

Our Picks

Newly freed hostages face long road to recovery after two years in captivity

October 15, 2025

Former Kenyan Prime Minister Raila Odinga dies at 80

October 15, 2025

New NATO member offers to buy more US weapons to Ukraine as Western aid dwindles

October 15, 2025

Russia expands drone targeting on Ukraine’s rail network

October 15, 2025
Don't Miss
Entertainment

Trisha Paytas Learns About GLP-1, Loses 26 Pounds in 6 Weeks

By adminJune 18, 20260

Ozempic is no laughing matter for comedians. Ms Handler revealed that an “anti-aging doctor” prescribed…

Jim Carrey returns for ‘Grinch’ sequel

June 18, 2026

Niall Horan reacts to Love Island star Zac’s One Direction obsession

June 18, 2026

Knicks’ Jalen Brunson and Josh Hart celebrate at NBA Championship Parade

June 18, 2026
About Us
About Us

Welcome to BWE News – your trusted source for timely, reliable, and insightful news from around the globe.

At BWE News, we believe in keeping our readers informed with facts that matter. Our mission is to deliver clear, unbiased, and up-to-date news so you can stay ahead in an ever-changing world.

Our Picks

Massive explosion in Moscow shatters Putin’s protective shell

June 18, 2026

Man arrested after 3-year-old boy trapped in crocodile enclosure at zoo in UK

June 18, 2026

Track Strait of Hormuz reopening with live maps and charts

June 18, 2026

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Facebook X (Twitter) Instagram Pinterest
  • Home
  • About Us
  • Advertise With Us
  • Contact US
  • DMCA
  • Privacy Policy
  • Terms & Conditions
© 2026 bwenews. Designed by bwenews.

Type above and press Enter to search. Press Esc to cancel.